
Investigation Highlights Pakistan's Major Economic Losses from Tensions and Trade Route Closures
KABUL (Afghan Verified) -- An investigation has highlighted the major economic losses Pakistan is suffering as a result of ongoing tensions and the prolonged closure of trade routes.
RTA reported on the investigation in a piece published on April 1, 2026, describing the damages as enormous.
The report links the economic harm directly to the tensions and the extended period during which trade routes have been closed, disrupting commerce.
Specific details such as loss figures, affected trade routes, timelines, or statements from officials were not included in the source summary.
The claim originates from this single investigation covered by RTA, with no additional corroboration or named sources provided.
Know more about this story?
If you have additional information or believe something is inaccurate, let us know. Your tips help us stay accurate.
Sources (1)
More in Economy

Over 28,000 Foreign Nationals Entered and Exited Afghanistan in Solar Year 1404: NSIA

Contract Signed for Salt Extraction in Herat's Ghoryan District with $5.342 Million Investment

Water from Herat's Pashdan Dam Released for First Time for Irrigation

Helmand Officials Meet UNDP, Contractors on Rebuilding Rain-Damaged Washir Check Dam
ReliableOver 28,000 Foreign Nationals Entered and Exited Afghanistan in Solar Year 1404: NSIA
Afghanistan's National Statistics and Information Authority reported 16,276 foreign entries and 12,198 exits in solar year 1404, totaling over 28,000 movements, mostly for work via land borders.
ReliableContract Signed for Salt Extraction in Herat's Ghoryan District with $5.342 Million Investment
The Ministry of Mines and Petroleum signed a 15-year contract with a domestic company for salt extraction from Block Five in Herat's Ghoryan district, involving a $5.342 million investment and royalties of 1,500 Afghanis per ton. Minister Mullah Hayatullah Badri stated the company must provide social services, environmental protection, and about 110 jobs.
ReliableWater from Herat's Pashdan Dam Released for First Time for Irrigation
The Ministry of Water and Energy announced the first release of water from Herat's Pashdan Dam to irrigate agricultural lands in Karkh district, following requests from local farmers and residents. Maulvi Abdul Salam Mostofi Agha, head of the Harirud-Murghab River Basin Authority, urged public cooperation in maintaining the dam and using water effectively.
ReliableHelmand Officials Meet UNDP, Contractors on Rebuilding Rain-Damaged Washir Check Dam
Helmand Deputy Governor Maulvi Mohammad Nabi Hamas and Water and Energy Director Mullah Mohammad Yaqub Qaim met with UNDP representatives and contractors to plan the rebuilding of the rain-damaged Washir Check Dam, with surveys set to start immediately. The Islamic Emirate called on the international community to hand over such projects to them for better quality.