ECONOMY — June 22, 2026
Small Dam Completed in Badghis Province at Cost of 1.79 Million Afghanis
Located in Zow Padai village of Abkamari district, the dam measures 23.4 meters in length with a storage capacity of 3,752 cubic meters and created jobs for local residents during construction.
The Ehtebar Desk — originates with Bakhtar News — corroborated by Pajhwok — 2 min read

A small dam project has been completed in Zow Padai village of Abkamari district in Badghis province. The initiative was undertaken to address local water needs and environmental concerns in the area.
Built at a cost of 1,786,780 Afghanis, the dam extends 23.4 meters in length. Its water storage capacity stands at 3,752 cubic meters, allowing for significant water retention during various seasons.
The entire project was conducted under the oversight of the provincial technical supervision team. Officials ensured that all work met the necessary technical standards, followed the contract details, and complied with the project specifications.
One of the primary goals of the dam is to improve water resource management for the area. By storing water effectively, it can assist in meeting the needs of the local population and agriculture.
The project also focuses on preventing soil degradation, which is a common issue in the region. This will help maintain the quality of the land for future use.
In addition, the dam aims to strengthen natural resources and enhance the local environment. Such improvements can lead to better ecological balance in Abkamari district.
The construction phase of the project provided employment for residents. This aspect helped support the local economy during the building process.
The benefits are expected to be long-lasting for the community in Badghis province. The dam represents a step toward sustainable development in water and environmental management.
Read the original reporting at Bakhtar News →
Reliability assessment
Core event corroborated by two independent outlets (Bakhtar News and Pajhwok) with matching details on location, cost, dimensions and purpose.
The source language reads straight.
Across the newsrooms
Where reports agree
- A small check dam project was completed in Zow Padai village, Abkamari district, Badghis at a cost of 1,786,780 Afghanis with length 23.4m and capacity 3,752 cubic meters.
- The project was supervised by the provincial technical team and provides local water management and employment benefits.
Filed by 2 outlets
Bakhtar News
Originating
Reported straight
Reported straight
Pajhwok
Reported straight
Reported straight
Filed under
Economy — Badghis, Abkamari, Zow Padai, check dam, water management
Spotted an error or have more on this story? Tip the desk on Telegram → or WhatsApp →.
Reader supported
Keep Ehtebar running
Every published story uses paid tools to translate reporting, compare sources, extract claims, and produce a clearer read on Afghanistan. Reader support helps keep that work independent.
€5
helps cover daily verification runs
€15
supports a week of source comparison
€50
keeps independent analysis moving
More in Economy

Contract Signed for Rehabilitation of 15-Kilometer Section of Southern Salang Highway
— Reliable

Kazakhstan Signs Zinc Export Contract with Afghan Company
— Reliable

Fire in Kabul's Mandawi Market Causes Eight Million Afghanis in Losses
— Reliable

Deputy Prime Minister for Economic Affairs Meets with Qatari Ambassador
— Reliable